Latest Firearms & Gold News

Fortuna Extends Kingfisher Deposit With Drill Intersect Of 4.1g/t Au Over 15.3 Meters At The Seguela Mine, Cote D’ivoire

0

VANCOUVER, British Columbia, Dec. 16, 2024 (GLOBE NEWSWIRE) — Fortuna Mining Corp. (NYSE: FSM | TSX: FVI) is pleased to provide an update on its exploration program at the Séguéla Mine in Côte d’Ivoire.

Paul Weedon, Senior Vice President, Exploration, commented,

“The prospectivity of Kingfisher is underscored by the recent intersections of 15.3 meters averaging 4.1 g/t Au and 17 meters averaging 3.3 g/t Au; approximately 150 meters further along strike of the recently reported maiden Inferred Resource of 294,000 ounces averaging 2.3 g/t Au1.”

Mr. Weedon added, “At the Sunbird deposit, mineralization has been successfully drill defined approximately 650 meters further along strike from the limits of the existing underground resource and remains open.”

Drilling highlights include:
Kingfisher deposit

SGRD2133:

3.7 g/t Au
3.3 g/t Au
26.9 g/t Au
3.6 g/t Au
11.8 g/t Au

over an estimated true width of 2.6 meters from 167 meters, and
over an estimated true width of 17.0 meters from 175 meters, including
over an estimated true width of 0.9 meters from 186 meters, and
over an estimated true width of 4.3 meters from 202 meters, including
over an estimated true width of 0.9 meters from 202 meters

SGRD2136:

4.1 g/t Au
18.9 g/t Au
19.7 g/t Au

over an estimated true width of 15.3 meters from 127 meters, including
over an estimated true width of 0.9 meters from 131 meters, and
over an estimated true width of 0.9 meters from 138 meters

SGRD2124:

3.3 g/t Au
31.6 g/t Au

over an estimated true width of 13.6 meters from 229 meters, including
over an estimated true width of 0.9 meters from 244 meters

 

 

 

Sunbird deposit

SGRD2091:

7.2 g/t Au
21.4 g/t Au
13.4 g/t Au

over an estimated true width of 13.3 meters from 409 meters, including
over an estimated true width of 0.7 meters from 410 meters and
over an estimated true width of 2.1 meters from 418 meters

SGRD2092:

4.0 g/t Au
18.1 g/t Au
10.3 g/t Au
11.0 g/t Au

over an estimated true width of 17.5 meters from 314 meters, including
over an estimated true width of 1.4 meters from 316 meters, and
over an estimated true width of 0.7 meters from 335 meters, and
over an estimated true width of 0.7 meters from 337 meters

SGRD2099:

20.4 g/t Au
390.8 g/t Au
156.8 g/t Au
18.0 g/t Au

over an estimated true width of 19.6 meters from 397 meters, including
over an estimated true width of 0.7 meters from 402 meters, and
over an estimated true width of 0.7 meters from 422 meters, and
over an estimated true width of 2.8 meters from 431 meters

 

 

 

Note:
1.   Refer to Fortuna news release dated December 10, 2024: “Fortuna updates Mineral Reserves and Mineral Resources for the Séguéla Mine, Côte d’Ivoire”

Kingfisher deposit

A further 58 holes totaling 11,103 meters were completed at the Kingfisher deposit since early September 2024 (refer to Figure 1), of which 16 holes totaling 3,286 meters were drilled subsequent to the maiden Inferred Resource data cut-off date (refer to Fortuna news release dated December 10, 2024). Kingfisher remains open at depth for most of the drilled 2-kilometer strike, with the deepest drilling only testing to approximately 250 meters below surface (refer to Figure 2).

Mineralization at Kingfisher demonstrates a clear association with the strongly deformed contact zone between a series of felsic intrusives, quartz veining, and host basaltic units. The change in strike orientation along the structure from north-south to north-east coincides with the higher grade, broader mineralization intervals. Mineralization is characterized by silica-biotite-sericite-carbonate alteration and pyrite development within and adjacent to the quartz veining.

Two drill rigs will continue working into the second quarter of 2025 to support resource infill drilling for resource conversion as well as drilling for depth and strike extensions.

Figure 1: Séguéla Mine deposit locations

Figure 2: Kingfisher deposit long-section – looking west

image-20241216220943-2

Sunbird deposit

At Sunbird, results from a further 24 holes, totaling 9,065 meters of a planned 12,000-meter drilling program have been received, with several high grades returned including 20.4 g/t Au over an estimated true width of 19.6 meters from 397 meters in drill hole SGRD2099 (refer to Figure 3).

The program is designed to infill and extend the current mineralized footprint as part of a program to evaluate underground mining potential, with mineralization remaining open more than 600 meters below surface, or more than 800 meters down plunge from the margin of the planned open pit. The most recent drill hole, which stepped out 150 meters to the south of the reported drilling and for which assays are pending, reported more than 15 points of visible gold (VG) associated with extensive alteration and quartz veining over an interval of 28 meters.

Drilling will continue into the first half of 2025 to support an updated resource model and underground mining studies.

Figure 3: Sunbird deposit long section – looking west

image-20241216220943-3

Refer to Appendix 1 for full details of the drill holes and assay results for this drill program at the Séguéla Mine.

Quality Assurance & Quality Control (QA – QC)

All drilling data completed by the Company utilized the following procedures and methodologies. All drilling was carried out under the supervision of the Company’s personnel.

All reverse circulation (RC) drilling used a 5.25-inch face sampling pneumatic hammer with samples collected into 60-liter plastic bags. Samples were kept dry by maintaining enough air pressure to exclude groundwater inflow. If water ingress exceeded the air pressure, RC drilling was stopped, and drilling converted to diamond core tails. Once collected, RC samples were riffle split through a three-tier splitter to yield a 12.5 percent representative sample for submission to the analytical laboratory. The residual 87.5 percent samples were stored at the drill site until assay results were received and validated. Coarse reject samples for all mineralized samples corresponding to significant intervals are retained and stored on-site at the Company-controlled core yard.

All diamond drilling (DD) drill holes started with HQ sized diameter, before reducing to NQ diameter diamond drill bits on intersecting fresh rock. The core was logged, marked up for sampling using standard lengths of one meter or to a geological boundary. Samples were then cut into equal halves using a diamond saw. One half of the core was left in the original core box and stored in a secure location at the Company core yard at the project site. The other half was sampled, catalogued, and placed into sealed bags and securely stored at the site until shipment.

All RC and DD samples were transported to ALS’s preparation laboratory in Yamoussoukro, Côte d’Ivoire, before also being transported via commercial courier, to ALS’s facility in Ouagadougou, Burkina Faso. Routine gold analysis using a 50-gram charge and fire assay with an atomic absorption finish was completed for all samples. Quality control procedures included the systematic insertion of blanks, duplicates and sample standards into the sample stream. In addition, the ALS laboratory inserted its own quality control samples.

Qualified Person

Paul Weedon, Senior Vice President, Exploration for Fortuna Mining Corp., is a Qualified Person as defined by National Instrument 43-101 being a member of the Australian Institute of Geoscientists (Membership #6001). Mr. Weedon has reviewed and approved the scientific and technical information contained in this news release. Mr. Weedon has verified the data disclosed, including the sampling, analytical and test data underlying the information or opinions contained herein by reviewing geochemical and geological databases and reviewing diamond drill core. There were no limitations to the verification process.

About Fortuna Mining Corp.

Fortuna Mining Corp. is a Canadian precious metals mining company with five operating mines in Argentina, Burkina Faso, Côte d’Ivoire, Mexico, and Peru, as well as the preliminary economic assessment stage Diamba Sud Gold Project located in Senegal. Sustainability is integral to all our operations and relationships. We produce gold and silver and generate shared value over the long-term for our stakeholders through efficient production, environmental protection, and social responsibility. For more information, please visit our website.

ON BEHALF OF THE BOARD

Jorge A. Ganoza
President, CEO, and Director
Fortuna Mining Corp.

Investor Relations:
Carlos Baca | [email protected] | fortunamining.com | X | LinkedIn | YouTube

Forward-looking Statements

This news release contains forward-looking statements which constitute “forward-looking information” within the meaning of applicable Canadian securities legislation and “forward-looking statements” within the meaning of the “safe harbor” provisions of the Private Securities Litigation Reform Act of 1995 (collectively, “Forward-looking Statements”). All statements included herein, other than statements of historical fact, are Forward-looking Statements and are subject to a variety of known and unknown risks and uncertainties which could cause actual events or results to differ materially from those reflected in the Forward-looking Statements. The Forward-looking Statements in this news release include, without limitation, statements about further extension potential at the Kingfisher deposit; statements that the Sunbird deposit continues to support underground mining potential; the Company’s expectations regarding drilling in the first half of 2025 to support an updated resource model and underground mining studies at the Sunbird deposit; mineral reserve and mineral resource estimates; expectations regarding additional drilling and exploration programs planned; the Company’s business strategy, plans and outlook; the merit of the Company’s mines and mineral properties; mineral resource and reserve estimates; timelines; the future financial or operating performance of the Company; expenditures; approvals and other matters. Often, but not always, these Forward-looking Statements can be identified by the use of words such as “estimated”, “potential”, “open”, “future”, “assumed”, “projected”, “used”, “detailed”, “has been”, “gain”, “planned”, “reflecting”, “will”, “containing”, “remaining”, “to be”, or statements that events, “could” or “should” occur or be achieved and similar expressions, including negative variations. Forward-looking Statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any results, performance or achievements expressed or implied by the Forward-looking Statements. Such uncertainties and factors include, among others, changes in general economic conditions and financial markets; changes in prices for gold, silver, and other metals; the timing and success of the Company’s proposed exploration programs; technological and operational hazards in Fortuna’s mining and mine development activities; risks inherent in mineral exploration; fluctuations in prices for energy, labor, materials, supplies and services; fluctuations in currencies; uncertainties inherent in the estimation of mineral reserves, mineral resources, and metal recoveries; the Company’s ability to obtain all necessary permits, licenses and regulatory approvals in a timely manner; governmental and other approvals; political unrest or instability in countries where Fortuna is active; labor relations issues; as well as those factors discussed under “Risk Factors” in the Company’s Annual Information Form for the financial year ended December 31, 2023. Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in Forward-looking Statements, there may be other factors that cause actions, events or results to differ from those anticipated, estimated or intended. Forward-looking Statements contained herein are based on the assumptions, beliefs, expectations and opinions of management, including but not limited to expectations regarding the results from the exploration programs conducted at the Company’s mineral properties including the Diamba Sud Gold Project; expected trends in mineral prices and currency exchange rates; the accuracy of the Company’s information derived from its exploration programs at the Company’s mineral properties; current mineral resource and reserve estimates; the presence and continuity of mineralization at the Company’s properties; that the Company’s activities will be in accordance with the Company’s public statements and stated goals; that there will be no material adverse change affecting the Company or its properties; that all required approvals will be obtained; that there will be no significant disruptions affecting operations and such other assumptions as set out herein. Forward-looking Statements are made as of the date hereof and the Company disclaims any obligation to update any Forward-looking Statements, whether as a result of new information, future events or results or otherwise, except as required by law. There can be no assurance that Forward-looking Statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, investors should not place undue reliance on Forward-looking Statements.

Cautionary Note to United States Investors Concerning Estimates of Reserves and Resources

Reserve and resource estimates included in this news release have been prepared in accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”) and the Canadian Institute of Mining, Metallurgy, and Petroleum Definition Standards on Mineral Resources and Mineral Reserves. NI 43-101 is a rule developed by the Canadian Securities Administrators that establishes standards for public disclosure by a Canadian company of scientific and technical information concerning mineral projects. Unless otherwise indicated, all mineral reserve and mineral resource estimates contained in the technical disclosure have been prepared in accordance with NI 43-101 and the Canadian Institute of Mining, Metallurgy and Petroleum Definition Standards on Mineral Resources and Reserves. Canadian standards, including NI 43-101, differ significantly from the requirements of the Securities and Exchange Commission, and mineral reserve and resource information included in this news release may not be comparable to similar information disclosed by U.S. companies.

Appendix 1: Séguéla Mine drill program details of the drill holes and assay results for the Kingfisher and Sunbird deposits

Kingfisher deposit

HoleID

Easting
(WGS84_29N)

Northing
(WGS84_29N)

Elevation
(m)

EOH1,2
Depth
(m)

UTM
Azimuth

Dip

Depth2
From
(m)

Depth2
To
(m)

Drilled2
Width
(m)

ETW3
(m)

Au (ppm)

Hole
Type4

Area

SGRD2075

743562

891494

403

129

90

-60

57

59

2

1.7

3.2

RCD

Kingfisher

 

 

 

 

 

 

 

77

85

8

6.8

0.7

RCD

Kingfisher

 

 

 

 

 

 

 

97

98

1

0.9

6.1

RCD

Kingfisher

SGRD2077

743550

891652

416

165

90

-60

131

146

15

12.8

2.7

RCD

Kingfisher

 

 

 

 

 

 

incl

131

132

1

0.9

28.1

RCD

Kingfisher

SGRD2078

743559

891601

416

145.6

90

-60

91

94

3

2.6

2.2

RCD

Kingfisher

 

 

 

 

 

 

 

99

106

7

6.0

0.9

RCD

Kingfisher

SGRD2079

743579

891692

420

159

90

-60

NSI

 

 

 

 

RCD

Kingfisher

SGRD2080

743607

892501

420

219

90

-60

190

198

8

6.8

0.8

RCD

Kingfisher

SGRC2100

743648

891154

396

50

90

-60

NSI

 

 

 

 

RC

Kingfisher

SGRC2101

743619

891150

398

91

90

-60

NSI

 

 

 

 

RC

Kingfisher

SGRC2102

743615

891252

400

40

90

-60

NSI

 

 

 

 

RC

Kingfisher

SGRD2103

743528

891200

402

180

90

-60

139

143

4

3.4

1.3

RCD

Kingfisher

SGRD2104

743557

891199

401

123.3

90

-60

NSI

 

 

 

 

RCD

Kingfisher

SGRD2105

743532

891447

404

168.1

90

-60

105

117

12

10.2

0.8

RCD

Kingfisher

SGRD2106

743564

891445

403

147.3

90

-60

90

98

8

6.8

0.7

RCD

Kingfisher

SGRD2107

743538

891338

405

171

90

-60

NSI

 

 

 

 

RCD

Kingfisher

SGRD2108

743531

891400

405

198

90

-60

106

109

3

2.6

4.4

RCD

Kingfisher

SGRD2109

743545

892151

429

210.2

90

-60

153

162

9

7.7

1.1

RCD

Kingfisher

 

 

 

 

 

 

 

169

170

1

0.9

5.3

RCD

Kingfisher

SGRD2110

743543

892200

424

200.2

90

-60

152

163

11

9.4

1.4

RCD

Kingfisher

 

 

 

 

 

 

 

172

174

2

1.7

2.6

RCD

Kingfisher

SGRD2111

743495

892198

436

243.3

90

-60

NSI

 

 

 

 

RCD

Kingfisher

SGRD2112

743593

892196

414

162.2

90

-60

96

110

14

11.9

1.0

RCD

Kingfisher

 

 

 

 

 

 

 

120

134

14

11.9

0.9

RCD

Kingfisher

SGRD2113

743572

892047

447

243

90

-60

126

149

23

19.6

1.0

RCD

Kingfisher

SGRD2114

743569

892350

418

198.2

90

-60

155

164

9

7.7

3.1

RCD

Kingfisher

SGRD2115

743569

892299

425

260

90

-60

142

153

11

9.4

0.6

RCD

Kingfisher

SGRD2116

743576

892250

418

250

90

-60

125

131

6

5.1

1.8

RCD

Kingfisher

 

 

 

 

 

 

 

149

160

11

9.4

1.1

RCD

Kingfisher

SGRD2117

743552

892090

445

260

90

-60

NSI

 

 

 

 

RCD

Kingfisher

SGRD2118

743507

892150

438

290

90

-60

62

66

4

3.4

1.3

RCD

Kingfisher

SGRD2119

743542

892500

436

300

90

-60

NSI

 

 

 

 

RCD

Kingfisher

SGRD2120

743712

892857

417

228

90

-60

183

188

5

4.3

3.2

RCD

Kingfisher

 

 

 

 

 

 

 

194

208

14

11.9

1.1

RCD

Kingfisher

SGRD2121

743600

892394

417

216.3

90

-60

NSI

 

 

 

 

RCD

Kingfisher

SGRD2122

743464

892453

457

348.3

90

-60

316

320

4

3.4

2.2

RCD

Kingfisher

SGRD2123

743550

892449

432

250

90

-60

193

195

2

1.7

6.4

RCD

Kingfisher

 

 

 

 

 

 

 

204

214

10

8.5

1.0

RCD

Kingfisher

SGRD2124

743632

892649

434

280

90

-60

171

172

1

0.9

9.6

RCD

Kingfisher

 

 

 

 

 

 

 

188

191

3

2.6

2.4

RCD

Kingfisher

 

 

 

 

 

 

 

203

206

3

2.6

2.3

RCD

Kingfisher

 

 

 

 

 

 

 

229

245

16

13.6

3.3

RCD

Kingfisher

 

 

 

 

 

 

incl

244

245

1

0.9

31.6

RCD

Kingfisher

SGRD2125

743578

892650

444

320.4

90

-60

NSI

 

 

 

 

RCD

Kingfisher

SGRD2126

743587

892700

446

310

90

-60

271

280

9

7.7

0.9

RCD

Kingfisher

 

 

 

 

 

 

 

285

291

6

5.1

2.1

RCD

Kingfisher

SGRD2127

743516

892700

459

400

90

-60

NSI

 

 

 

 

RCD

Kingfisher

SGRD2128

743615

892545

426

293

90

-60

211

216

5

4.3

2.2

RCD

Kingfisher

SGRC2129

743619

892746

439

97

90

-60

Not
Sampled

 

 

 

 

RC

Kingfisher

SGRD2130

743669

892746

430

264.1

90

-60

149

151

2

1.7

3.0

RCD

Kingfisher

 

 

 

 

 

 

 

194

208

14

11.9

1.9

RCD

Kingfisher

 

 

 

 

 

 

 

212

218

6

5.1

3.5

RCD

Kingfisher

 

 

 

 

 

 

incl

221

222

1

0.9

28.0

RCD

Kingfisher

 

 

 

 

 

 

 

259

261

2

1.7

4.0

RCD

Kingfisher

SGRD2131

743746

892908

428

199.6

90

-60

 

 

0

0.0

 

RCD

Kingfisher

SGRD2132

743621

892744

440

330

90

-60

249

253

4

3.4

5.2

RCD

Kingfisher

 

 

 

 

 

 

 

262

277

15

12.8

0.9

RCD

Kingfisher

SGRD2133

743759

892955

422

216.2

90

-60

167

170

3

2.6

3.7

RCD

Kingfisher

 

 

 

 

 

 

 

175

195

20

17.0

3.3

RCD

Kingfisher

 

 

 

 

 

 

incl

186

187

1

0.9

26.9

RCD

Kingfisher

 

 

 

 

 

 

 

202

207

5

4.3

3.6

RCD

Kingfisher

 

 

 

 

 

 

incl

202

203

1

0.9

11.8

RCD

Kingfisher

SGRD2134

743805

893004

409

150.2

90

-60

NSI

 

 

 

 

RCD

Kingfisher

SGRD2135

743631

892500

414

220

90

-60

 

 

0

0.0

 

RCD

Kingfisher

SGRD2136

743792

892955

417

160.2

90

-60

127

145

18

15.3

4.1

RCD

Kingfisher

 

 

 

 

 

 

incl

131

132

1

0.9

18.9

RCD

Kingfisher

 

 

 

 

 

 

and

138

139

1

0.9

19.7

RCD

Kingfisher

SGRD2137

743719

892906

429

260.2

90

-60

 

 

0

0.0

 

RCD

Kingfisher

SGRD2138

743580

892500

426

290

90

-60

 

 

0

0.0

 

RCD

Kingfisher

SGRD2139

743584

892546

430

340

90

-60

 

 

0

0.0

 

RCD

Kingfisher

SGRC2141

743780

892550

399

80

90

-60

NSI

 

 

 

 

RC

Kingfisher

SGRC2142

743755

892500

401

80

90

-60

NSI

 

 

 

 

RC

Kingfisher

SGRC2143

743760

892450

399

84

90

-60

NSI

 

 

 

 

RC

Kingfisher

SGRC2144

743710

892350

402

80

90

-60

10

11

1

0.9

7.1

RC

Kingfisher

 

 

 

 

 

 

 

32

54

22

18.7

1.0

RC

Kingfisher

 

 

 

 

 

 

 

60

69

9

7.7

9.5

RC

Kingfisher

 

 

 

 

 

 

incl

63

64

1

0.9

62.0

RC

Kingfisher

SGRC2145

743735

892400

400

80

90

-60

NSI

 

 

 

 

RC

Kingfisher

SGRD1667

743780

892802

407

160.1

90

-60

77

79

2

1.7

3.2

RCD

Kingfisher

 

 

 

 

 

 

 

84

94

10

8.5

1.1

RCD

Kingfisher

 

 

 

 

 

 

 

98

105

7

6.0

1.2

RCD

Kingfisher

SGRD1723

743785

892700

406

100

90

-60

19

32

13

11.1

0.9

RCD

Kingfisher

SGRC1797

743835

892858

415

100

90

-60

14

27

13

11.1

1.0

RC

Kingfisher

 

 

 

 

 

 

 

46

52

6

5.1

1.3

RC

Kingfisher

SGRD1830

743807

892750

403

82

90

-60

17

29

12

10.2

1.2

RCD

Kingfisher

 

 

 

 

 

 

 

43

52

9

7.7

0.7

RCD

Kingfisher

SGRC1834

743745

892550

404

100

90

-60

26

47

21

17.9

1.0

RC

Kingfisher

SGRD1836

743720

892450

403

120

90

-60

41

68

27

23.0

2.1

RCD

Kingfisher

 

 

 

 

 

 

 

60

61

1

0.9

10.4

RCD

Kingfisher

SGRD1860

743671

892350

406

130

90

-60

40

41

1

0.9

5.6

RCD

Kingfisher

 

 

 

 

 

 

 

47

48

1

0.9

11.6

RCD

Kingfisher

SGRD1863

743669

892300

410

130

90

-60

67

72

5

4.3

1.2

RCD

Kingfisher

Notes:

1. EOH: End of hole
2. Depths and widths reported to nearest significant decimal place
3. NSI: No significant intercepts
4. ETW: Estimated true width
5. RC: reverse circulation drilling | DD: diamond drilling tail | RCD: reverse circulation drilling with diamond tail

Sunbird deposit

HoleID

Easting
(WGS84_29N)

Northing
(WGS84_29N)

Elevation
(m)

EOH1,2
Depth
(m)

UTM
Azimuth

Dip

Depth2
From
(m)

Depth2
To
(m)

Drilled2
Width
(m)

ETW3
(m)

Au (ppm)

Hole
Type4

Area

SGRD2081

742525

892585

556

420

90

-60

NSI

 

 

 

 

RCD

Sunbird

SGRD2082

742550

892435

561

310.2

90

-60

230

231

1

0.7

12.5

RCD

Sunbird

 

 

 

 

 

 

 

264

271

7

4.9

8.0

RCD

Sunbird

 

 

 

 

 

 

incl

264

265

1

0.7

40.0

RCD

Sunbird

SGRD2083

742520

892410

560

380.1

90

-60

305

307

2

1.4

3.2

RCD

Sunbird

 

 

 

 

 

 

 

338

341

3

2.1

6.0

RCD

Sunbird

 

 

 

 

 

 

incl

338

339

1

0.7

16.2

RCD

Sunbird

 

 

 

 

 

 

 

359

368

9

6.3

6.6

RCD

Sunbird

 

 

 

 

 

 

incl

360

362

2

1.4

21.4

RCD

Sunbird

SGRD2084

742550

892550

567

399.2

90

-60

348

361

13

9.1

2.9

RCD

Sunbird

 

 

 

 

 

 

incl

351

352

1

0.7

18.9

RCD

Sunbird

SGRD2085

742490

892410

555

480.1

90

-60

387

394

7

4.9

1.3

RCD

Sunbird

 

 

 

 

 

 

 

425

445

20

14.0

4.1

RCD

Sunbird

 

 

 

 

 

 

incl

433

436

3

2.1

16.4

RCD

Sunbird

 

 

 

 

 

 

and

437

438

1

0.7

14.0

RCD

Sunbird

SGRC2086

742540

892635

555

40

90

-60

Not
Sampled

 

 

 

 

RC

Sunbird

SGRC2087

742540

892400

566

60

90

-60

Not
Sampled

 

 

 

 

RC

Sunbird

SGRC2088

742540

892635

555

48

90

-60

Not
Sampled

 

 

 

 

RC

Sunbird

SGRD2089

742544

892637

540

440

90

-60

387

395

8

5.6

1.0

RCD

Sunbird

SGRD2090

742541

892398

540

338.1

90

-60

281

296

15

10.5

1.4

RCD

Sunbird

SGRD2091

742490

892408

538

440.2

90

-60

409

428

19

13.3

7.2

RCD

Sunbird

 

 

 

 

 

 

incl

410

411

1

0.7

21.4

RCD

Sunbird

 

 

 

 

 

 

and

418

421

3

2.1

13.4

RCD

Sunbird

SGRD2092

742552

892544

553

356

90

-60

314

339

25

17.5

4.0

RCD

Sunbird

 

 

 

 

 

 

incl

316

318

2

1.4

18.1

RCD

Sunbird

 

 

 

 

 

 

and

335

336

1

0.7

10.3

RCD

Sunbird

 

 

 

 

 

 

and

337

338

1

0.7

11.0

RCD

Sunbird

SGRD2093

742494

892383

538

420.2

90

-60

360

385

25

17.5

0.9

RCD

Sunbird

 

 

 

 

 

 

 

394

404

10

7.0

1.7

RCD

Sunbird

 

 

 

 

 

 

 

411

418

7

4.9

0.8

RCD

Sunbird

SGRD2094

742563

892636

547

390

90

-60

NSI

 

 

 

 

RCD

Sunbird

SGRD2095

742468

892376

553

480.2

90

-60

427

441

14

9.8

6.2

RCD

Sunbird

 

 

 

 

 

 

incl

433

435

2

1.4

20.8

RCD

Sunbird

 

 

 

 

 

 

and

437

439

2

1.4

15.2

RCD

Sunbird

SGRD2096

742550

892785

540

430.1

90

-60

385

415

30

21.0

2.8

RCD

Sunbird

 

 

 

 

 

 

incl

404

405

1

0.7

10.3

RCD

Sunbird

 

 

 

 

 

 

and

406

407

1

0.7

21.9

RCD

Sunbird

 

 

 

 

 

 

and

408

409

1

0.7

11.3

RCD

Sunbird

SGRD2097

742556

892859

524

456.2

90

-60

397

405

8

5.6

1.0

RCD

Sunbird

 

 

 

 

 

 

 

411

423

12

8.4

3.9

RCD

Sunbird

 

 

 

 

 

 

incl

413

414

1

0.7

17.7

RCD

Sunbird

 

 

 

 

 

 

and

415

416

1

0.7

16.5

RCD

Sunbird

SGRD2098

742497

892357

557

420.2

90

-60

344

362

18

12.6

3.5

RCD

Sunbird

 

 

 

 

 

 

incl

347

348

1

0.7

13.7

RCD

Sunbird

 

 

 

 

 

 

and

361

362

1

0.7

10.9

RCD

Sunbird

 

 

 

 

 

 

 

385

394

9

6.3

1.5

RCD

Sunbird

SGRD2099

742485

892334

545

447.2

90

-60

372

386

14

9.8

2.0

RCD

Sunbird

 

 

 

 

 

 

 

397

425

28

19.6

20.4

RCD

Sunbird

 

 

 

 

 

 

incl

402

403

1

0.7

390.8

RCD

Sunbird

 

 

 

 

 

 

and

422

423

1

0.7

156.8

RCD

Sunbird

 

 

 

 

 

 

 

431

435

4

2.8

18.0

RCD

Sunbird

 

 

 

 

 

 

incl

434

435

1

0.7

66.9

RCD

Sunbird

SGRD2200

742520

892675

544

480

90

-60

321

322

1

0.7

20.4

RCD

Sunbird

 

 

 

 

 

 

 

377

378

1

0.7

108.2

RCD

Sunbird

 

 

 

 

 

 

 

428

451

23

16.1

2.9

RCD

Sunbird

 

 

 

 

 

 

incl

450

451

1

0.7

10.4

RCD

Sunbird

SGRD2201

742465

892310

569

465.2

90

-60

366

377

11

7.7

3.6

RCD

Sunbird

 

 

 

 

 

 

incl

369

370

1

0.7

33.1

RCD

Sunbird

 

 

 

 

 

 

 

402

407

5

3.5

1.8

RCD

Sunbird

 

 

 

 

 

 

 

437

450

13

9.1

1.7

RCD

Sunbird

 

 

 

 

 

 

 

462

463

1

0.7

45.2

RCD

Sunbird

SGRD2202

742445

892275

573

513.2

90

-60

395

405

10

7.0

1.2

RCD

Sunbird

 

 

 

 

 

 

 

409

414

5

3.5

1.3

RCD

Sunbird

 

 

 

 

 

 

 

484

504

20

14.0

6.2

RCD

Sunbird

 

 

 

 

 

 

incl

486

487

1

0.7

15.9

RCD

Sunbird

 

 

 

 

 

 

and

489

490

1

0.7

15.6

RCD

Sunbird

 

 

 

 

 

 

and

498

499

1

0.7

19.7

RCD

Sunbird

SGRD2203

742545

892685

553

450.1

90

-60

404

428

24

16.8

2.0

RCD

Sunbird

SGRD2204

742540

892510

563

400.1

90

-60

333

350

17

11.9

1.1

RCD

Sunbird

Notes:

1. EOH: End of hole
2. NSI: No significant intercepts
3. ETW: Estimated true width
4. Depths and widths reported to nearest significant decimal place
5. RC: reverse circulation drilling | DD: diamond drilling tail | RCD: reverse circulation drilling with diamond tail

Photos accompanying this announcement are available at:

https://www.globenewswire.com/NewsRoom/AttachmentNg/a7c86b54-02dc-4974-861a-d623c6c8eb62

https://www.globenewswire.com/NewsRoom/AttachmentNg/23203bd7-691f-49bb-8f7f-da8633a34b08

https://www.globenewswire.com/NewsRoom/AttachmentNg/1cc9eac4-791d-47ed-a363-845e8796e7e6

A PDF accompanying this announcement is available at http://ml.globenewswire.com/Resource/Download/392d1d7f-e892-4abc-b100-1cb6679e7d43

Figure 1

image-20241216221010-4

Séguéla Mine deposit locations

Figure 2

image-20241216221010-5

Kingfisher deposit long-section – looking west

Figure 3

image-20241216221010-6

Sunbird deposit long section – looking west

 

Read the full article here

Leave A Reply

Your email address will not be published.

This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish. Accept Read More

Privacy & Cookies Policy